Six targets, one district-scale property
Don Adamo is an emerging silver and gold project with high growth potential. It is made up of six targets at different stages of advancement: Lejano, Adamo, Cisne, Ciclón Oeste, Perseverante and Ciclón Este.
The 73,000 ha property belongs to Yacimientos Patagónicos and is operated by Deseado Resources under an exploration and option-to-purchase agreement. It was explored by Polimet/Yamana in 1998, by Coeur d’Alene Mines from 2002 to 2016, and by Yacimientos Patagónicos from 2017 to 2026.
- Location
- Deseado Massif, Santa Cruz, Argentina
- Access
- 40 km east of Bajo Caracoles via Provincial Route 39
- Area
- 73,000 ha across several mining titles
- Ownership
- Yacimientos Patagónicos
- Operator
- Deseado Resources, under an exploration and option-to-purchase agreement
- Commodities
- Silver and gold
- Historical work
- 25,822 m in 278 drill holes and 2,134 surface samples
In the heart of a major mining district
The project is reached directly from the town of Bajo Caracoles by Provincial Route 39, which connects to National Route 40, in the northwest of Santa Cruz Province. The area is backed by infrastructure on its doorstep, including a regional airport and high-tension power lines, and the land package is made up of several contiguous mining titles.
Don Adamo sits in the heart of the Deseado Massif, surrounded by some of the district’s largest deposits. With more than 73,000 ha under an exploration and option-to-purchase agreement, we see the potential to build a mining district in its own right.
- Cerro Negro
- 8.16 Moz Au, 52.7 Moz Ag
- San José
- 2.5 Moz Au, 165 Moz Ag
- Cap Oeste–COSE
- 1.3 Moz AuEq
- Cerro Bayo–La Flora
- South of Don Adamo

A world-class silver-gold province
The Deseado Massif is a gold-silver metallogenic province defined by low- and intermediate-sulphidation epithermal deposits, formed together with their host volcanic rocks of the Bahía Laura Group. These rocks record bimodal volcanism of Middle to Late Jurassic age: interlayered lavas, domes, epiclastic rocks, volcaniclastic breccias and dykes.
Mineralization occurs mainly as vein fill along fault systems that bound structural blocks, as disseminations in volcanic and dome-margin breccias, and as replacement of epiclastic layers.
Ciclón Este leads our first campaign
Of Don Adamo’s six targets, Ciclón Este is where we see the strongest potential for near-term discovery: a silver-rich vein and veinlet system across 2.5 × 5 km, with high-grade results at surface and in historical drilling. It is the sole focus of our first exploration campaign.
Explore Ciclón Este
The other five targets remain at earlier stages of advancement, held for future campaigns:
Ciclón Este
Flagship target. A silver-rich vein and veinlet system with drilling by Minera Santa Cruz in 2022–2023. Includes the Cerro Armando veins.
View targetLejano
The most advanced target, with a 2013 historical resource estimate. Best historical intercept: 2 m @ 1,325 g/t Ag and 3.4 g/t Au.
Adamo
Drilled by Coeur d’Alene Mines between 2009 and 2013, with geophysics by Yacimientos Patagónicos. Up to 2 m @ 1,120 g/t Ag.
Cisne
Silver intercepts at depth, including 6.47 m @ 412 g/t Ag with 1.25 m @ 1.75 g/t Au.
Ciclón Oeste
The first veins recognized on the property, by Polimet/Yamana in 1998, tested with 15 drill holes.
Perseverante
Part of the Ciclón Este work area. [Add a short description.]
Nearly three decades of exploration
As of August 2026, the project has 25,822 m of drilling in 278 holes and 2,134 surface samples (channels, floats and chips) across its six targets. The historical database, including assay certificates, was provided by Yacimientos Patagónicos.
- 1998Polimet/Yamana
Recognized the Ciclón veins (today Ciclón Oeste) and drilled 2,612 m in 15 holes. Best result: CIW-7, 2 m @ 134 g/t Ag and 2,360 g/t Pb.
- 2002Coeur d’Alene Mines
Acquired Mina Martha and all of Polimet/Yamana’s concessions in the Deseado Massif, including Lejano and Ciclón.
- 2003–2008Coeur d’Alene Mines
Mapping and sampling, airborne magnetics at Lejano and ASTER imagery. Work focused on Lejano, Cerro Armando (Ciclón Este) and Cisne. By the end of 2008 the project had 16,545 m of RC drilling.
- 2009–2013Coeur d’Alene Mines
Continued work at Lejano, Cisne and Adamo. In 2013, NCL Ingeniería y Construcción completed a resource estimate for Lejano.
- 2017Yacimientos Patagónicos
Took control of the property. Magnetics, induced polarization and resistivity surveys at Adamo, and discovery of the Ciclón Este veins, part of the same system as Cerro Armando. Surface values up to 2,000 g/t Ag and 2.5 g/t Au.
- 2022–2023Minera Santa Cruz (Hochschild Mining)
Exploration agreement over Ciclón Este: 2,091 m in 13 HQ diamond holes. Best result: DCE-22-02, 2.9 m @ 620 g/t Ag.
- Jul 2026Deseado Resources
Exploration and option-to-purchase agreement signed with Yacimientos Patagónicos.
Selected historical drill intercepts
Best reported intervals from previous operators. Intervals are downhole lengths; true widths are not known.
| Target | Hole | Interval (m) | Ag (g/t) | Au (g/t) | From (m) | Elevation (m asl) | Silver grade |
|---|---|---|---|---|---|---|---|
| Ciclón Este | DCE-22-02 | 2.9 | 620 | incl. 1 m @ 1.6 | 63.5 | 980 | |
| Lejano | DDH-87 | 2.0 | 1,325 | 3.4 | 65 | 760 | |
| Lejano | RC-11 | 12.0 | 641 | 1.8 | 0 | 850 | |
| Adamo | ADA-E | 2.0 | 1,120 | – | 128 | 592 | |
| Adamo | ADA-30 | 2.0 | 689 | – | 72 | 670 | |
| Adamo | ADA-30 | 8.0 | 378 | – | 130 (to end of hole) | 620 | |
| Adamo | ADA-1 | 2.0 | 658 | – | 17 | 695 | |
| Adamo | ADA-15 | 3.0 | 270 | – | 97 | 650 | |
| Cisne | C-16 | 6.47 | 412 | incl. 1.25 m @ 1.75 | 160.25 | 650 | |
| Cisne | C-06 | 2.92 | 297 | – | 44.7 | 711 |
Lejano historical resource estimate (2013)
Prepared by NCL Ingeniería y Construcción Ltda. for Coeur d’Alene Mines. This is a historical estimate; it has not been verified by a qualified person on behalf of Deseado Resources and should not be relied upon.
| Category | Tonnes | Ag (g/t) | Au (g/t) | Ag (Moz) | Au (oz) |
|---|---|---|---|---|---|
| Indicated | 1,118,454 | 92.9 | 0.283 | 2.9 | 10,180 |
| Inferred | 2,999,778 | 52.1 | 0.196 | 5.71 | 18,874 |
Ciclón Este, our flagship target
Geology, interpretation and our planned exploration program.